Winchester Observatory Construction
June 2003
| Looking In | June 2003 |
![]() |
|
| Insulation has been added below. In summer, the attic is much warmer than the inside of the observatory. | |
| Inside the Observatory | June 2003 |
![]() |
|
| Looking in from the doorway: A) Windlass system opens/closes the dome shutters. B) Shutter Relay controls power to the windlass motor. C) Weather Station transmitter. D) 4-AC outlet box (seen from the side here) is computer controllable! E) Power Supply for all dome hardware. F) Digital DomeWorks computer. G) DDW Receiver for the Weather Station. |
|
| Control Room | 2002 July 26 |
![]() |
|
| Access to the attic is by the stairway at left. The door out to the observatory area is at right. | |